OverviewFast Fit is an off the shelf engineered clamping solution to connect two steel sections together without the need for onsite drilling or welding. All you need to secure two sections together comes in one box. The system comprises a frame which wraps around the edges of the sections and slides into place to provide a position for the clamps to be secured. The system allows for varying angles that can be easil achieved by sliding the beams relative to each other. The Fast Fit system delivers a guaranteed connection every
time without the need for on-site testing or relying on the skills of the installer. No removal of the protective coatings on the existing steel or holes is needed to make a connection. All that is required to complete a connection are simple hand tools and semi-skilled labour.
time without the need for on-site testing or relying on the skills of the installer. No removal of the protective coatings on the existing steel or holes is needed to make a connection. All that is required to complete a connection are simple hand tools and semi-skilled labour.
- No drilling or welding of existing or new steel
- Allows for varying cross over angles
- Guaranteed Safe Working load
- Flush connection between both steel sections
- Independently load tested
Product FAQs:
Can Fast Fit connect steel sections at angles other than 90 degrees?
ANSWER: Yes the Fast Fit system can allow for angle cross overs of up to 45 degrees but this depends on the widths of the steel that is being connected. Please see technical table for the widths and angles that can be achieved.
Is a location plate required with Fast Fit?
ANSWER: No the Fast Fit system wraps around the two sections of steel that can sit flush against each other.
How long does it take to install Fast Fit?
ANSWER: Fast Fit takes less than five minutes to install, see the video on the resources section of this website.
Can Fast Fit connect steel sections at angles other than 90 degrees?
ANSWER: Yes the Fast Fit system can allow for angle cross overs of up to 45 degrees but this depends on the widths of the steel that is being connected. Please see technical table for the widths and angles that can be achieved.
Is a location plate required with Fast Fit?
ANSWER: No the Fast Fit system wraps around the two sections of steel that can sit flush against each other.
How long does it take to install Fast Fit?
ANSWER: Fast Fit takes less than five minutes to install, see the video on the resources section of this website.